Installation Area

The JuiceBox OpenPay requires 2 sets of THHN wires (per National Electrical Code (NEC) and/or local Authority Having Jurisdiction (AHJ) requirements and each set must have a dedicated ground conductor). Each set connects to a separate 50A breaker.

All wires must protrude at least 14 in (36 cm) from the base of the installation area so that the connections can be housed inside the junction box.

The base of the JuiceBox OpenPay is secured to 4 1/2 in ground studs which are positioned 10 1/2 in apart.

NOTE: Image not to scale.